Contractors.

Excel has more than 20 years’ experience of delivering specialist IT infrastructure design and installation projects for the building and construction industry.

Our work with the construction industry includes new-build datacentre and corporate office installations, refurbishments and major move / relocation projects.

Designed to meet the specific requirements of the main contractor, our end-to-end service covers everything from initial design through installation, testing and hand-over.

From the work of our dedicated design consultancy team through to implementation, testing and final handover, our Xceed™ integrated service delivery model ensures a premium is placed on innovation, risk control and quality assurance.

Our 24 x 7 x 365 working capability ensures totally flexible working around wider construction operations; a flexibility and commitment to accurate and timely delivery that is further enhanced by off-site pre-termination and a full logistics management service to cover sourcing and procurement.

Features of our structured cabling and infrastructure services support for contractors include:

  • New-build and refurbishment
  • Offices and datacentres
  • 24 x 7 x 365 working capability
  • EMEA wide delivery
  • Sub-contracting or CDM
  • ISO9001:2008

Flexible Contracting

Working as sub-contractors or under CDM, we deliver services through
a full range of standard and bespoke contract models.

Health & Safety

As a CHAS (Contractors Health and Safety Assessment Scheme) accredited company, we are dedicated to completing health and safety pre-qualification assessments to a nationally-recognised threshold standard.

chas_logo_1

constructionline_logo_1

Assured Quality

Excel has held ISO 9001:2008 accreditation with the National Quality Association since 1994. We regularly secure quality awards for our work with contractor partners.

Contractors | Resources

Case Study

Excel worked closely with the main contractor in the delivery of this £2.5m IIM system upgrade across three live trading floors for a global banking group.

Read more

Case Study

Close and responsive working with the main contractor was the key to success with this 10Gbs-to-the-desk solution and best practice datacentre for a global technology giant. 
Read more

 

 

Back to Top